Posted by Luke Quentel, on August 28, 2024.
Graf UK recently completed a stormwater attenuation tank installation for MV Kelly at Lambs Lane in Blackpool. The project, undertaken on the 4th of July, involved the installation of an attenuation tank at a depth of 1.44 meters. This installation was essential for managing stormwater runoff effectively on the site, ensuring long-term sustainability and compliance with local regulations. The attenuation tank was constructed using our EcoBloc Maxx crates, a modular and highly efficient system designed to manage stormwater effectively. The project involved the installation of 287.53 cubic meters of storage capacity, which will help mitigate the risk of flooding during heavy rainfall events by temporarily storing excess water and gradually releasing it into the surrounding soil or drainage systems. This system not only provides an effective solution for stormwater management but also contributes to the overall environmental sustainability of the development. The EcoBloc Maxx crates are known for their durability and flexibility, allowing for easy installation and maintenance. This project exemplifies Graf UK’s commitment to delivering high-quality, sustainable water management solutions tailored to the needs of our clients. The successful completion of this project at Lambs Lane in Blackpool highlights the expertise of Graf UK in providing reliable and efficient stormwater management solutions. We are proud to have worked with MV Kelly on this project, contributing to the development of infrastructure that supports both the environment and the community.